The TI UCC57142EVM evaluation board allows connection to various test points, such as IN, EN/FLT, OCP, and OUT, through surface-mount test points. The UCC57142EVM can support different UCC57142 variants via jumpers. Modifications make the board compatible with other gate drivers in the DBV package.
Features
- Test points allow probing all the key pins of the UCC57142
- Allows quick verifications of most of the data sheet parameters
- Compatibility across all UCC57142 variants and other TI gate drivers in the DBV package
- External TO-220 power device low-side connection
- PCB layout optimized for bias supply bypassing capacitor and gate resistor selection
Applications
- Digital-controlled PFC
- Air conditioner
- Home appliances
- Motor drives
- General-purpose low-side gate driver for single-ended topologies
Kit Contents
- UCC57142EVM
- Generic evaluation kit user's guide
Layout
Bench Setup Diagram
Paskelbta: 2025-09-14
| Atnaujinta: 2025-09-21

