Texas Instruments TPS7H2201EVM eFuse Evaluation Module (EVM)
Texas Instruments TPS7H2201EVM eFuse Evaluation Module (EVM) demonstrates the operation of a single TPS7H2201 eFuse (Radiation Tolerant/Hardened Plastic). The Texas Instruments TPS7H2201EVM provides footprints that can be populated with additional components for testing customized configurations, such as parallel or redundant eFuses.Features
- Flexible configuration options, including single- and parallel-device circuits
- Customizable soft start, current limit, current limit timers, enable threshold, undervoltage threshold, and capacitance
Kit Contents
- TPS7H2201EVM evaluation module
- Evaluation kit user's guide
Board Layout
Paskelbta: 2023-09-01
| Atnaujinta: 2023-09-08
