Texas Instruments DLP470NEEVM DMD Evaluation Module (EVM)
Texas Instruments DLP470NEEVM DMD Evaluation Module (EVM) can accelerate the prototyping time of a DLP 0.47-inch 1080p system when combined with the DLPC4430EVM. The Texas Instruments DLP470NEEVM provides a solution for evaluating the 0.47-inch 1080p digital micromirror device (DMD), which is designed to pair with the DLPC4430EVM and can display SPLASH, test patterns, and video from the HDMI source on the DMD.Features
- 1080p (1920 × 1080) display resolution
- 5.4µm micromirror pitch
- ±17° micromirror tilt (relative to flat state)
- Bottom illumination
- 2x LVDS input data bus
Board Layout
Paskelbta: 2024-02-16
| Atnaujinta: 2024-02-20
