Texas Instruments DEM-OPA-DTK-EVM Evaluation Module
Texas Instruments DEM-OPA-DTK-EVM Evaluation Module is a demonstration fixture facilitating designers to evaluate the operation and performance of high-speed, wide bandwidth operational amplifiers. The DEM-OPA-DTK-EVM PC board is unpopulated and compatible with 8-pin SON (DTK and DRG) packaged single channel amplifiers. The TI DEM-OPA-DTK-EVM Evaluation Module offers maximum flexibility and ease of use, accommodating multiple amplifier configurations.Features
- Includes optional termination resistors on inputs and outputs for easy use with 50Ω test equipment
- Feedback network components for inverting and non-inverting configurations
- Configurable for single or split-supply operation
- Standard SMA footprints for input and output signal connections
- High-speed optimized layout to reduce parasitic effects
PCB Layout
Paskelbta: 2022-07-20
| Atnaujinta: 2025-03-06
