Texas Instruments bq79616EVM-021 Battery Monitor Evaluation Module
Texas Instruments bq79616EVM-021 Battery Monitor Evaluation Module (EVM) is an evaluation board for the bq79616-Q1. The bq79616-Q1 provides high accuracy channel measurements for six to sixteen battery cells. With the inclusion of a daisy chain communication port, the Texas Instruments bq79616-Q1 device is stackable (up to 35 devices) to support large stack configurations found in battery packs for electrified automotive drive trains.Features
- Highly accurate monitoring of 16 li-ion cells
- Integrated protector
- Internal cell balancing
- 1Mb/s stackable isolated differential-UART
- ASIL-D voltage/temperature/communication
Kit Contents
- bq79616EVM evaluation module
- SFI 23/18 twisted pair communication cable
Board Setup
Paskelbta: 2021-01-13
| Atnaujinta: 2022-03-11